 |
|
|
 |
| |
|
12/18/2007
The newly opened contemporary art gallery
FERRARI GALLERY
looks to the Dupre Group projection and LED linear lighting solutions
to present the style and theme of the collection to all
that drive by.
12/05/2007
After review of several lighting options,
Woody's Bar and
Grill
while in the middle of a full remodeling effort
considers the Dupre Group's lighting design approach to
ensure the maximum comfort and attraction of patrons.
|
|
|
|
 |
|
|
 |
|
|
 |
| |
|
Typical Pre-/Post-Project
Activities |
Deliverables |
Anticipated Fees/Cost |
|
Step 1:
Meet with our client(s) and
determine lighting goals, aspirations,
and
expectations in terms of:
-
Desired level and
impact of lighting
enhancement
-
Lighting solution
attributes--tranquil,
dramatic, hi-tech,
efficiency, among
others
-
Implementation
delivery in stages
or all at once
-
Frequency of
consultation/input
-
Timetable
-
Range of budget
Discuss
and answer questions on
style and technical
factors to consider:
-
Quality and
durability of fixtures
-
Necessary features
for transformers (low volt) or
illuminators (fiber optic)
-
Essential quality
measures taken during installations
-
Warranties
|
- Knowledge sharing
and idea generating "brainstorming"
|
@No Cost |
|
Step 2:
With all client expectations in mind,
design lighting approach, then present
Once presented and all
questions are answered, determine the
"Go/No-Go" decision
If a "Go", a down payment
of 10% directs our team to complete a
detailed design (first deliverable).
40% directs our team to
go forward with the complete
project--detailed design through
implementation. |
-
A written proposal
including ranged pricing
-
A preliminary design
in digital photographic format
|
@No Cost* |
|
Step 3:
Incorporate any final client input,
ideas, or changes necessary into a final
plan to be implemented
Component and fixtures
orders are made and implementation begins per
design |
- A final
Exterior Lighting
Design with an agreed upon project
start date and high level
bill-of-materials
|
55% Due |
|
Implementation Process:
Once complete (generally
in 40hrs or less from time of fixtures
and component arrival on location), resulting light
placement and configuration walkthrough
is performed with client.
After 2-4 days with
lighting in place, final adjustment is
performed, final fees are paid, all wire
is buried, and our 1 year client service
maintenance begins.
|
-
Fully tailored,
configured and installed lighting
system scenario)
|
Balance Due |
|
|
|
|
|
|